TRT-assembly-operations

1.5 Meter assembly tasks man-day comments and feed back
Shell construction
CHI operations
Engineering- CHI
Material order- XN50
Machine long mold
make long shells
measure straightness
measure gas leaks
cut to length
machine aligment holes
clean
machine glueing holes
straws
order wrapper
test conducting wrapper
wind straws at Lamina
leak test- visual inspct
test conductivity
apply reinforcing fibers
test straightness
Pressure test straws
cut to length
clean
Wires
check wire breaks
attach wire breaks
test HV for break
HV Plate
design- order
inspect plate-test HV
insert straw socket
insert capacitor socket
prepare and inspect shoulder
Tension plate
Design-order
inspect-test
solder wire bushing
gas holes prep
IC connection
align and glue capacitor sleeve
test
Transition Radiation material
order TR
test material
Punch
slit
3 sequence punch
stack in frames
check dimensions
assemble in blocks
Tooling (details elsewhere)
Tooling design
Tooling machining
Tooling testing
Assembly of Module
align shell holder-insert shell
insert flushing tube
insert cooling tube
assemble Kapton dividers
glue Katpon and foam in jig
clean and inspect
insert central divider-glue
insert TR and Kapton in shell(3&4)
insert TR and Kapton in shell(2&5)
insert TR and Kapton in shell(1&6)
finalize alignment-pins
glue Kapton
Insert HV plate L
Insert HV plate R
glue plates
insert straws
glue straws
leak test glue joints
insert HV foil-L
insert HV foil -R
insert twistor-L
insert twister -R
leak test-L&R
HV test -R
HV test -L
insert tension plate R-glue frame
insert tension plate L-glue frame
glue capacitor sleeves-R
glue capacitor sleeves-L
Glue HV feed -L
Glue HV feed -R
insert wire
align wire
pin wire
tension test while stringing
leak test -R
Leak test -L
HV test L
HV test R
capacitor insertion
wire soldering
gas connections
water cooling connections
Module Testing

Last Update: 13/9/96

Name: Rick Van Kooten